Space Launch System
SLS Block 1 with the Orion spacecraft launching from Pad 39B | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Function | Super heavy-lift launch vehicle | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Manufacturer |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Country of origin | United States | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Project cost | US$26.4 billion | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Cost per launch | US$2.5 billion | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Cost per year | US$2.6 billion (FY23) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Size | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Height | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Diameter | 8.4 m (27.6 ft)[2] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Mass | 2,610,000 kg (5,750,000 lb)[3] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Stages | 2½ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Maximum thrust |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Capacity | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Payload to LEO | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Altitude | 200 km (120 mi)[4] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Orbital inclination | 28.5° | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Mass |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Payload to TLI | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Mass | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Associated rockets | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Based on | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Comparable |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Launch history | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Status | Active | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Launch sites | Kennedy, LC-39B | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Total launches | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Success(es) | 1 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| First flight | 16 November 2022, 06:47:44 UTC[6] (1:47:44 am EST) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Carries passengers or cargo | Orion | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
The Space Launch System (SLS) is an American super heavy-lift expendable launch vehicle used by NASA. As the primary launch vehicle of the Artemis Moon landing program, SLS is designed to launch the crewed Orion spacecraft on a trans-lunar trajectory. The first (and so far only) SLS launch was the uncrewed Artemis I, which took place on 16 November 2022.
Development of SLS began in 2011 as a replacement for the retiring Space Shuttle as well as the canceled Ares I and Ares V launch vehicles. SLS was built using existing Shuttle technology, including solid rocket boosters and RS-25 engines. The rocket has been criticized for its political motivations, seen as a way to preserve jobs and contracts for aerospace companies involved in the Shuttle program at great expense to NASA. The project has faced significant challenges, including mismanagement, substantial budget overruns, and significant delays. The first Congressionally mandated launch in late 2016 was delayed by nearly six years.
All Space Launch System flights are to be launched from Launch Complex 39B at the Kennedy Space Center in Florida. The first three SLS flights are expected to use the Block 1 configuration, comprising a core stage, extended Space Shuttle boosters developed for Ares I and the Interim Cryogenic Propulsion Stage (ICPS) upper stage. The improved Block 1B configuration, with the powerful and purpose-built Exploration Upper Stage (EUS), is planned to be introduced on the fourth flight; a further improved Block 2 configuration with new solid rocket boosters is planned for the ninth flight. After the launch of Artemis IV, NASA plans to transfer production and launch operations of SLS to Deep Space Transport LLC, a joint venture between Boeing and Northrop Grumman.
Cite error: There are <ref group=lower-alpha> tags or {{efn}} templates on this page, but the references will not show without a {{reflist|group=lower-alpha}} template or {{notelist}} template (see the help page).
- ^ Cite error: The named reference
SLS_Lift_Capacitywas invoked but never defined (see the help page). - ^ NASA (27 October 2021). "Space Launch System Core Stage". nasa.gov. Archived from the original on 15 June 2020. Retrieved 19 November 2022.
- ^ "SLS October 2015 Fact Sheet" (PDF). Archived (PDF) from the original on 6 September 2014. Retrieved 19 November 2022.
- ^ "2018 draft factsheet of SLS capabilities" (PDF). NASA. 20 August 2018. Archived (PDF) from the original on 30 June 2019. Retrieved 24 August 2022.
- ^ "2024 update on SLS status". NASA. Retrieved 16 May 2025.
- ^ Cite error: The named reference
nasa-blog-20221108was invoked but never defined (see the help page). - ^ a b Cite error: The named reference
SRBSheetwas invoked but never defined (see the help page). - ^ Cite error: The named reference
SLS Booster Developmentwas invoked but never defined (see the help page). - ^ @NASAGroundSys (2 October 2024). "The results are in… *drumroll* 🥁
Core stage weighs a total of 215,910 pounds! When full of propellant, core stage will weigh over 2 million pounds.
Using the Vehicle Assembly Building high bay crane and a secondary crane, Exploration Ground Systems teams lifted the @NASA_SLS core stage for @NASAArtemis II approximately 6 inches from its current mounts. Teams repeated the lift, weighing the core stage twice to ensure an exact weight reading was achieved" (Tweet). Retrieved 3 October 2024 – via Twitter. - ^ Cite error: The named reference
SLSCoreStageFactSheetwas invoked but never defined (see the help page). - ^ Cite error: The named reference
RS-25was invoked but never defined (see the help page). - ^ Cite error: The named reference
ICPS_ULA_Infographic_2021was invoked but never defined (see the help page). - ^ "Delta IV Launch Services User's Guide" (PDF). United Launch Alliance. Archived (PDF) from the original on 21 September 2018. Retrieved 13 April 2024.
- ^ a b c Cite error: The named reference
SLS_Specs_SFIwas invoked but never defined (see the help page). - ^ Cite error: The named reference
RL10was invoked but never defined (see the help page). - ^ "1 year down, a galaxy to go". Boeing. Archived from the original on 21 April 2024. Retrieved 13 April 2024.
- ^ "RL10 Engine". Aerojet Rocketdyne. Archived from the original on 7 November 2021. Retrieved 18 November 2021.