Manchester Piccadilly station
Aerial view of Piccadilly station in 2007 | |||||
| General information | |||||
| Location | Manchester, Greater Manchester England | ||||
| Coordinates | 53°28′37″N 2°13′48″W / 53.477°N 2.230°W | ||||
| Grid reference | SJ847978 | ||||
| Managed by | Network Rail | ||||
| Transit authority | Greater Manchester | ||||
| Platforms | 14 (National Rail) 2 (Manchester Metrolink) | ||||
| Other information | |||||
| Station code | MAN | ||||
| Fare zone | City (D) | ||||
| Classification | DfT category A | ||||
| Key dates | |||||
| 1842 | Opened as Store Street | ||||
| 1847 | Renamed Manchester London Road | ||||
| 1861 | Rebuilt | ||||
| 1881 | Expanded | ||||
| 1960 | Renovated and renamed Manchester Piccadilly | ||||
| 2002 | Renovated | ||||
| Passengers | |||||
| 2019/20 | 32.199 million | ||||
| 2020/21 | 5.188 million | ||||
| 2021/22 | 19.581 million | ||||
| Interchange | 1.236 million | ||||
| 2022/23 | 23.558 million | ||||
| Interchange | 2.046 million | ||||
| 2023/24 | 25.776 million | ||||
| Interchange | 2.148 million | ||||
Listed Building – Grade II | |||||
| Feature | Train shed at Piccadilly Station | ||||
| Designated | 6 June 1994 | ||||
| Reference no. | 1283014[1] | ||||
| |||||
| |||||
Manchester Piccadilly is the main railway station of the city of Manchester, in the metropolitan county of Greater Manchester, England. Opened originally as Store Street in 1842, it was renamed Manchester London Road in 1847 and became Manchester Piccadilly in 1960. Located to the south-east of the city centre, it hosts long-distance intercity and cross-country services to national destinations including London, Birmingham, Nottingham, Glasgow, Edinburgh, Cardiff, Bristol, Exeter, Plymouth, Reading, Southampton and Bournemouth; regional services to destinations in Northern England including Liverpool, Leeds, Sheffield, Newcastle and York; and local commuter services around Greater Manchester. It is one of 19 major stations managed by Network Rail. The station has 14 platforms: 12 terminal and two through platforms (numbers 13 and 14). Piccadilly is also a major interchange with the Metrolink light rail system with two tram platforms in its undercroft.
Manchester Piccadilly is the busiest station in the Manchester station group (the other major stations in Manchester are Manchester Oxford Road and Manchester Victoria). As of December 2024, it is the second-busiest station in the United Kingdom outside of London (after Birmingham New Street),[2] and is also one of the busiest interchange stations outside London, with over 2 million passengers changing trains annually.[3] The station hosts services from six train operating companies.
Between the late 1990s and early 2000s, Piccadilly station was refurbished, taking five years and costing £100 million (in 2002); it was the most expensive improvement on the UK rail network at the time.[4] Further improvements and expansion plans have been proposed. In December 2014, a Transport and Works Act application was submitted for the construction of two through platforms as part of the Manchester Piccadilly and Manchester Oxford Road Capacity Scheme.[5][6] In September 2019, Network Rail declared the Castlefield corridor through Manchester 'congested'.[7][8] Despite this, in 2023, these plans were withdrawn in favour of "a new approach", comprising upgrades to other stations in Manchester.[9][10]
- ^ Cite error: The named reference
NHLEwas invoked but never defined (see the help page). - ^ "ORR Statistics 2023-24".
- ^ "Office of Rail and Road".
- ^ "£100m station revamp opens". BBC News. 9 December 2002. Retrieved 4 September 2011.
- ^ "Network Rail - Enhancements Delivery Plan". Network Rail. September 2016. p. 11. Archived from the original on 29 September 2012. Retrieved 8 January 2017.
- ^ "Watch: How Piccadilly and Oxford Road stations could look after £1bn redevelopment". Manchester Evening News. 8 October 2014. Retrieved 20 October 2018.
- ^ "Castlefield Corridor - Congested Infrastructure Report: Capacity Analysis – System Operator" (PDF). Network Rail. 6 September 2019. Archived from the original (PDF) on 17 April 2022. Retrieved 2 December 2019.
- ^ "Twenty Fourth Supplemental Agreement to the Track Access Contract" (PDF). ORR. 24 June 2019. Retrieved 2 December 2019.
It noted that Network Rail had highlighted that the Corridor has congestion issues between 0700 and 2000 and would be more than happy to contractually agree to the additional rights being confined to the proposed hours of operation.
- ^ "Piccadilly Station should get two new platforms – but does 'crass stupidity' mean it might never happen?". Manchester Evening News. 8 February 2017.
- ^ Timan, Joseph (25 May 2023). "Plans for new Piccadilly platforms to solve Manchester rail chaos pulled". Manchester Evening News. Retrieved 17 August 2025.